Notice to Resume Work or of Measures Satisfied – Trans-Northern Pipeline Inc. (TNPI) – Order MP-001-2019 Measure #3
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
Trans-Northern Pipeline Inc. (TNPI) that the hazardous or detrimental situation described in Order No. MP-001-2019 Measure #3 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- suspended work may resume, and/or
- X the measures specified in the order have been satisfied.
Inspection Officer | |||
---|---|---|---|
Name | IO Designation # | Telephone | |
6 November 2019 | _______________________________ Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA or Incident #: CV1920-222