Summary of CER Commission Decisions and Recommendations
Decisions and Recommendations Issued by the Commission from 1 April 2020 to 31 March 2021 include the following:
Note that REGDOCS files can be found on the CER website (www.cer-rec.gc.ca) by clicking in the top banner: “Applications and hearings” then “View Regulatory Documents”. Then enter the REGDOCS File number below “Search by Document Number”.
Infrastructure:
Maritimes and Northeast Pipeline Management Ltd. Abandonment of Deep Panuke Custody Transfer Station
- Abandonments (NEB Act Part V, s. 74(1)(d))
- Abandonment of the Deep Panuke Custody Transfer Station
- Hearing Order number: MHW-001-2020
- The Commission released its letter decision and order in April 2020 which imposed six conditions
- Order number: ZO-001-2020
- REGDOCS File number: [C05902]
- Panel of Commissioners: Kathy Penney, Trena Grimoldby, Mark Watton
NOVA Gas Transmission Ltd. (NGTL) - Etzikom Abandonment Project
- Abandonments (NEB Act Part V, s. 74(1)(d))
- Abandon 84 km of pipeline, seven meter stations, and associated facilities including valves and sales taps near Medicine Hat, AB
- Hearing Order number: MHW-006-2019
- The Commission released its letter decision in May 2020
- REGDOCS File number: [C06388]
- Panel of Commissioners: Damien Côté, Trena Grimoldby, Mark Watton, Stephania Luciuk, Wilma Jacknife
NGTL North Corridor Expansion Project
- Large Pipeline Infrastructure (NEB Act, Part III, s. 52)
- The proposed Project would transport gas from the Peace River Project Area to growing intra-basin markets located in the North of Bens Area. The Project consists of approximately 81 km of looped pipeline, in three sections, with one compressor station unit addition
- Hearing Order number: GH-002-2019
- The Commission released its report in September 2020 which recommended 24 section 52 conditions and imposed 23 section 58 conditions
- REGDOCS File number: [C08154]
- Panel of Commissioners: Stephania Luciuk, Trena Grimoldby, Wilma Jacknife
TransQuébec & Maritimes Pipeline Inc. (TQM)
- Large Pipeline Infrastructure (NEB Act, Part III, s. 52)
- Application for approvals to purchase and operate the Sabrevois Assets owned by Energir, L.P., as well as to construct and operate the Bromon Compressor Station and Saint-Basile Interconnect
- Hearing Order number: GH-001-2020
- The Commission released its letter report and order in October 2020 which imposed 12 section 52 conditions and eight section 58 conditions
- Order number: MO-030-2020
- REGDOCS File number: [C09218]
- Panel of Commissioners: Damien Côté, Stephania Luciuk, Trena Grimoldby
NGTL Edson Mainline Expansion Project
- Large Pipeline Infrastructure (NEB Act, Part III, s. 52)
- The Project would construct and operate approximately 85 km of 1,219 mm (NPS 48) outside diameter natural gas pipeline loops in two sections, and associated facilities
- Hearing Order number: GH-001-2019
- The Commission released its report in November 2020 which recommended 24 section 52 conditions and imposed 23 section 58 conditions
- REGDOCS File number: [C09740]
- Panel of Commissioners: Damien Côté, Stephania Luciuk, Wilma Jacknife
Westridge Delivery Line Relocation
- Small Pipeline Infrastructure (NEB Act, Part III, s. 58)
- This project would consist of the construction of the relocated and upsized delivery line through a tunnel. Trans Mountain will proceed with the installation of three delivery lines, two of which are authorized through Certificate OC-064, and one of which would be authorized through an exemption order, which is being sought through the submission of this Application.
- Hearing Order number: MH-048-2018
- The Commission released its letter decision and order in May 2020 which imposed five conditions
- Order number: XO-004-2020
- REGDOCS File number: [C06322]
- Panel of Commissioners: Damien Côté, Kathy Penney, Mark Watton
Tolls and Tariffs:
NGTL Gas Temporary Service Protocol Tariff Extension
- Tariff extension (CER Act, Part 3, s. 225-240)
- Explorers and Producers Association of Canada (EPAC) application to extend the NGTL Temporary Service Protocol (TSP)
- The Commission released its letter decision with reasons and order in March 2021
- Order number: TG-001-2021
- REGDOCS File number: [C12183]
- Panel of Commissioners: Damien Côté, Mark Watton, Stephania Luciuk
Export and Import:
Altagas Long-Term License Application to Export Propane
- Export or Import Licenses (CER Act, Part 7, s. 344)
- 25-year Licence to export propane
- The Commission released its letter decision in August 2020 which imposed five conditions
- REGDOCS File number: [C08015]
- Panel of Commissioners: Mark Watton, Trena Grimoldby, Wilma Jacknife
Including the decisions and recommendations of the hearings listed above, the Commission has issued:
- 136 Infrastructure decisions;
- 20 Tolls and Tariffs decisions;
- 575 Export and Import decisions;
- 27 Exploration and Production decisions; and
- 20 Other decisions.
For a breakdown of these decisions, please see Appendix B.
Powers of the Board/Commission and Variances:
TMX Notice of Motion and Constitutional Question
- Powers of the Board/Commission and Variances (CER Act, Part 1, s. 32, s. 34, Part 6, s. 313)
- Request for relief from condition three to deem a tree clearing bylaw in Burnaby invalid
- Hearing Order number: MH-001-2021
- The Commission released its reasons for decision in February 2021
- Order number: MO-002-2021
- REGDOCS File number: [C11674]
- Panel of Commissioners: Damien Côté, Kathy Penney, Mark Watton
Trans-Northern Pipelines Inc. (TNPI) Application for s.21 review of National Energy Board Orders
- Powers of the Board/Commission and Variances (NEB Act, Part I, s. 21)
- Application from TNPI to review a previously approved pipeline relocation due to the company not properly notifying a landowner in the original application
- Hearing Order number: MH-009-2019
- The Commission released its letter decision in May 2020
- REGDOCS File number: [C06137]
- Panel of Commissioners: Full Commission