ARCHIVED – Notice to Resume Work or of Measures Satisfied – NOVA Gas Transmission Ltd. – Order MMO-001-2018

This page has been archived on the Web

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

Notice to Resume Work or of Measures Satisfied – NOVA Gas Transmission Ltd. – Order MMO-001-2018 [PDF 118 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE NATIONAL ENERGY BOARD ACT,
FOLLOWING AN ORDER UNDER SECTION 51.1

The undersigned National Energy Board Inspection Officer hereby notifies

Information not available

Nova Gas Transmission Ltd.

the hazardous or detrimental situation described in Order No. MMO-001-2018 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •  X  suspended work may resume, and/or
  •  X the measures specified in the order have been satisfied.
Inspection Officer
Inspection Officer Information not available Information not available Information not available
Name IO Designation # Telephone
02 Dec 2018 Information not available
Signature
Date
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA or Incident #: CV1819-525

Date modified: