Notice to Resume Work or of Measures Satisfied – Express Pipeline Ltd. – Order DRP-001-2021

Notice to Resume Work or of Measures Satisfied – Express Pipeline Ltd. – Order DRP-001-2021 [PDF 346 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies

Express Pipeline Ltd. that the hazardous or detrimental situation described in Order No. DRP- 001-2021 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •      suspended work may resume, and
  •  X  the measures specified in the order have been satisfied.
Inspection Officer
Inspection Officer Information not available Information not available Information not available
Name IO Designation # Telephone
08/10/2022
Signature
Date
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA number: CV2021-519